![]() |
Why Us
The Ghoman Design Group, Inc. will negotiate each aspect of the process on your behalf, transferring the cost savings directly to your bottom line. The Crowne Plaza Hotel Allentown renovation was completed (with the same specifications, standards and design) for approximately $1M, representing a $2 – 5 M reduction in total project costs. The hotel opened as a Crowne Plaza on February 4, 2004 with a passing score of 97.10%. |